Since my last update we have accomplished quite a bit. The overhead lights have been installed. The kitchen countertop and sink has been installed. We finished the fronts for the lower kitchen cabinets. And we have installed a water pump. Next we plan to lay the flooring on the loft and get the wall boards up. I’m working on a design for the backsplash area. I’ll post a sneak peek of that later as it progresses. There are so many little things that we still need to do that will pull it all together. I am really pleased with how it is progressing!
Previous Post
Van Build: Finally Installed the Window!