Since my last update we’ve installed the loft flooring and the furring strips for the Walls. We also put in a water pump. Once the walls are in we will start on the upper cabinetry and then I will be able to move on to the really fun part of decorating. There will be upholstery and curtains to make and lots of painting to do.
My latest YouTube video is out. Be sure to check out my Channel. You can also subscribe while there to be notified of new content.
Before we start installing the wall planks we are going to be adhering 4-way stretch carpet to the areas where the metal sides would still be showing. The bug screening can then go in, so we can get a little mosquito protection while we work. With the summer heat and humidity they have been out in full force!
I’m still working on the design that runs along the back of the counter top. I don’t wish to reveal too much too soon, but here is a sneak peak: